In data-center construction, “on time” isn’t a brag — it’s the baseline. Every day of delay means lost revenue, missed SLAs, and teams explaining downtime to stakeholders. That’s why owners and general contractors are turning to DBO’s precast duct-bank systems: they reduce risk at every level — safety, schedule, and reputation.
Keeping Projects Moving While Others Catch Up
Traditional cast-in-place duct banks tie up entire work zones for weeks. Concrete trucks, formwork, rebar, and curing all lock down access that other trades need.
DBO’s precast process keeps that from happening:
- Sections are delivered cured, tested, and ready to set.
- Typical crews install 400–600 linear feet per day with a 4 man crew.
- Trenches close the same shift they open.
That speed gives site leadership what they want most — concurrency. While electrical crews set duct banks, civil teams can prep grade, and mechanical trades can mobilize on schedule. Every trade stays in motion instead of waiting on concrete.
Proven Safety and Compliance
Safety performance is one of the most visible metrics on every data-center dashboard. DBO’s guided dowel-pin alignment system removes hands from the joint, keeps crews above grade, and reduces trench exposure by more than 80 percent.
- No rebar tying.
- No formwork.
- No confined-space trench labor.
That mechanical alignment system directly supports site safety-rating goals and the ESG “Social” pillar — measurable reductions in exposure hours, recordables, and inspection events.
Verified Strength. Documented Confidence.
Every DBO section is tested and traceable before it ships.
Our engineering documentation includes:
- HL-93 or higher load certification, verified through full-scale testing.
- 60 000-lb unsupported-joint test data proving shear-key integrity.
- Concrete compressive-strength and thermal-resistivity reports.
Owners and design teams get the same verification package used on hyperscale projects across North America — transparent proof that each run meets structural, thermal, and code requirements.
Schedule Certainty That Protects Launch Dates
When project milestones are tied to energization, precast isn’t a preference — it’s insurance.
- Predictable production: 4–6-week lead times with confirmed ship dates.
- Accelerated installation: one-day set and backfill.
- No weather-related pour delays.
Those gains translate directly into on-time commissioning and earlier revenue capture. For data-center owners, schedule reliability equals uptime reliability — the metric that matters most.
Reputation and ESG Protection
Data-center projects attract attention — from investors, regulators, and the media.
Every missed launch or safety incident becomes public quickly.
DBO’s controlled process helps protect both timelines and perception:
- Fewer on-site emissions through reduced trucking and idling.
- Lower embodied carbon verified against NRMCA EPD v3.2 benchmarks.
- Safer labor conditions validated through exposure-hour tracking.
That’s quantifiable ESG performance owners can include in annual sustainability reporting — not claims, but data.
Why Owners and GCs Keep Choosing DBO
- Concurrent trade access keeps all scopes productive.
- Verified structural and thermal testing removes engineering doubt.
- Predictable manufacturing and delivery prevent schedule slip.
- Field oversight and training ensure correct installation from day one.
- Measurable ESG results support corporate sustainability goals.
DBO doesn’t just supply duct banks — we deliver control over the risks that cost the most.
Building for Certainty
Every data-center project ends the same way: the day power goes live. DBO helps make sure that day happens on time, safely, and with the documentation to prove it. That’s how you reduce risk below grade — and protect everything built above it.