Underground work doesn’t slow down because a supplier does. That’s why DBO was built differently: full control of design, production, and logistics so your duct banks show up on time, ready to install, with no guesswork in between.

RED-E-DUCT builds good product — but they run a shared precast operation. We run a dedicated duct bank system engineered for speed, precision, and field integration.

Here’s how that difference shows up on your project.

Quick Comparison

FeatureDuct Bank One (DBO)RED-E-DUCT
Core Focus100% dedicated to duct banksShared production with other precast products
Lead Time4–6 weeks average8–12 weeks published; up to 3–6 months in backlog
Production Capacity320 sections per day (multi-line facility)Regional plant capacity shared across product lines
Quality ControlPlant QC on every batch, dimensional tolerance within ⅛ in.Batch QC per production run
Alignment System18-inch guide-pin alignment keeps hands clear while the pins do the workManual alignment, field-fit required within 6 inches
Delivery OptionsStockpiling or phased delivery to match trench progressBatch shipment on plant schedule
Field SupportOn-site technical startup support includedLimited or optional field guidance
TrainingReal life training facility + on-site crew educationNone listed
Submittal TurnaroundStamped calcs in 10–14 daysTypically 3–4 weeks
Safety80 % fewer trench personnel, hands-free alignment6-inch hand-alignment inside the pinch zone
SustainabilityRail-fed materials, optimized mix (≤ 25 % below NRMCA avg.)Standard mix, trucked materials

(Lead-time and emissions benchmarks verified through DBO production data, 2023; NRMCA EPD v3.2; AAR 2018.)

Why DBO Wins on Schedule

  • Dedicated form lines mean your order never competes with other precast products.
  • In-house design and reinforcement let us start fabrication as soon as submittals clear.
  • 320-piece daily output gives true volume capacity when projects scale.
  • Stamped calculations in 10–14 days keep engineering from stalling procurement.

RED-E-DUCT produces good work — but when their line is busy, the backlog grows. DBO’s duct-bank-only model keeps your timeline predictable, even at peak demand.

Why DBO Wins on Safety and Installation

DBO designed the guided dowel-pin joint system to eliminate the most dangerous part of installation — hands in the trench. Operators set to within 18 inches; dowels handle the rest. That one feature removes pinch points and keeps crews above grade. Crews trained through DBO’s program regularly achieve sub-5-minute sets per 10ft or 20ft section, closing trenches the same day. That’s safer work and a faster closeout — the two things every GC measures.

Why DBO Wins on Service

  • Real people, not a ticket system. Our engineers and logistics leads coordinate directly with your PM.
  • Startup support included. Field experts guide your first set to ensure alignment, sealing, and grade accuracy.
  • Training Facility. Foremen and operators can practice full installations before the first shipment.

When questions come up, you get answers from the people who built the product — not a sales desk.

When Schedule and Safety Matter Most

If your job can’t afford a two-month lead time or another day with a trench open, there’s only one choice built for that pace.

Duct Bank One delivers:

  • Safer, simpler installation.
  • Unmatched capacity.
  • Faster approvals.
  • Verified precision.
  • Proven reliability under schedule pressure.

Because underground work doesn’t need another supplier — it needs a partner who’s built for the way you build.

Request Stamped Calcs Today

Get your design review and stamped calculations in 10–14 days — start production as soon as submittals clear.